New Pedestrian Footbridge at Barcelona Port
NTi designed a pedestrian footbridge at the Port of Barcelona, built in 2018 for the Barcelona Port Authority. The footbridge crosses the railway tracks and is currently in service.
Project details
- Project
- New Pedestrian Footbridge at Barcelona Port
- Client
- Barcelona Port Authority (through Auding-Intraesa)
- Location
- Port of Barcelona, Spain
- Construction year
- 2018
- Status
- In service
- Construction cost
- €0.8M
- Length
- 36 m
- Width
- 2.0 m
- Foundation
- In situ concrete piles
- Columns
- In situ concrete
- Deck
- Carbon steel members and mesh
Our role
NTi carried out the design of the project.
Structure and access
The footbridge is a steel truss structure supported by in situ concrete columns on piles. Stair and lift access towers are located at both ends of the crossing.
Connections
The footbridge links the Tersaco building on the Muelle Príncipe de España with the opposite side, near a bus stop.
Contact us to discuss how we can support your project.