Project: Bridge Overpassing AP-7 Highway located at Vilademuls (Girona)


Client: Abertis (through Sacyr)


Construction year: 2013

Current state: under service


Location: Vilademuls (Girona)


Investment: 0.8 M €


Main Characteristics:


Length: 20 meters

Width: 7.0 meters

Foundation: In situ Concrete footings

Columns: In situ Concrete

Bridge board: In Situ Pre-Stressed Concrete