NTi was part of the project and construction management team for the New T1 Passengers Terminal Building at Barcelona Airport.

Project details

Project
Project and Construction Management of the New T1 Passengers Terminal located at Barcelona Airport
Client
Barcelona Airport (through Projects and Facilities Management)
Location
Barcelona Airport, Spain
Construction phase
2005 to 2011
Status
In service
Investment
€310M
Total length
1,120 m
Total width
460 m
Ground area
137,000 m²
Built-up area
540,000 m²
Processing capacity
30 Mpax
Airlines served
52

Our role

Part of the current NTi staff was part of the Project and Construction Management Team.

Terminal equipment

  • 182 check-in desks
  • 28 scanners
  • 15 walkthrough arches and metal detectors
  • 101 embarkation gates
  • 40 piers and 43 fingers
  • 15 baggage carousels
  • Control and airport management room

Automatic baggage management system

  • 27 km of total conveyor length
  • 6,000 motors
  • Nominal capacity of 8,000 bags per hour
  • 20 baggage carousels serving flights on the apron
  • Automated storehouse for early-checked bags, with capacity for 2,200 bags
  • Integrated baggage inspection system

Energy and climatisation

  • 60 MVA transformer substation (West)
  • Services distribution gallery
  • 8 MVA diesel engines (emergency plant)
  • Climatisation plant (cold and heat production)

Photo gallery

Computer rendering of the New T1 Passengers Terminal at Barcelona Airport, showing the airside apron and aircraft stands
Construction site of the New T1 Passengers Terminal, with cranes, reinforced concrete columns and formwork
Steel roof structure of a large building under construction, with two workers in high-visibility vests
Baggage reclaim carousels 07 and 06 in the arrivals hall
Security screening area with an X-ray scanner, a roller conveyor and a walkthrough metal detector
Jet bridges and glazed boarding gate area of the terminal, overlooking the apron
Check-in area with glazed façade and information desk A02
Control and airport management room with video walls and operator workstations
Check-in hall with rows of check-in counters and flight information displays
Site layout drawing of the terminal, with aircraft stands, piers and vehicle access roads
Baggage handling area with H06A sorting units and overhead signage
Suitcases on yellow baggage carriers on the automatic conveyor system
Baggage conveyor lines with access stairs and walkways in the sorting hall
MVT-11 baggage inspection units installed along the conveyor lines
Services distribution gallery with pipework and cable trays along the tunnel
Climatisation plant room with insulated pipework, valves and vertical equipment
Insulated pipework with valves and circulation pumps in the plant room
Diesel engine of the emergency power plant