A 100 m Viaduct Separating Truck and Train Traffic at the ICL Súria Site

NTi provided project and construction management for a new viaduct at the ICL Súria site, in the salt and potash mines of Súria, Catalonia. The viaduct removes the same-level crossing between trucks and trains. The structure is 100 m long and 7 m wide, with precast concrete piles as foundations, precast concrete columns and precast pre-stressed concrete beams for the deck. The viaduct was built in 2016 and 2017 for ICL Iberia and is currently in service.

Project facts

Client
ICL Iberia (Iberpotash SA)
Location
Salt and potash mines of Súria, Catalonia, Spain
Construction
2016 / 2017
Status
In service
Investment
€1.2M
NTi scope
Project management and construction management

Our role

NTi provided project management and construction management for the viaduct, from project development through to its construction.

Main characteristics

  • Length: 100 m.
  • Width: 7 m.
  • Foundations: precast concrete piles.
  • Columns: precast concrete.
  • Deck: precast pre-stressed concrete beams.